ጡጦ እና መመገቢያ

Which of the developers the State Architectural and Construction Inspectorate allowed to build a residential complex in the period from May 24 to 28, and which complexes it accepted into operation, and which not - read the material NERUKHOMI. 1. LCD on the street. Internationalists, 35 in Sumy from Fedorchenko's company. The permit was obtained on the sixth attempt for the construction of five (No. 6-10) multi-storey residential buildings. Grounds for refusal, provided in April 2021: playgrounds for children are located in violation of the DBN requirements (at a distance of less than 12 meters from the windows of a residential building and less than 20 meters from short-term parking areas, there is no branch along the perimeter with a strip of green spaces with a width of at least 3 meter); there is no justification for the use in the project documentation of the specific size of the site for physical education in 0.2 square meters per inhabitant; the size of the site for collecting household waste does not meet the requirements of the DBN (the area of ​​the site must be at ጡጦ እና መመገቢያ  least 21.28 square meters, and the area for the waste bin is indicated on the drawings of the master plan - 19.8 square meters), etc. At the same time, permission has now been granted on the basis of an expert report dated June 22, 2020, that is, the project has not undergone changes, and therefore the indicated shortcomings of the facility remain. 2. LCD Derby Style House from Graf development on the street. Fontanskaya road, 6 (IV and V stages) in Odessa. Continuation of construction. In March 2019, the Department of GASK in the Odessa region canceled urban planning conditions and restrictions for the development of a land plot. However, the developer resumed their action in court. These degrees are now the basis for issuing a permit for stages IV and V. In addition, the Unified State Register of Court Decisions contains information regarding the pre-trial investigation in criminal proceedings on the abuse of office by officials of the KP "Urban Capital Construction" and the transfer of land plots on the territory of Odessa for construction to private companies for insignificant investment fees, which are significantly lower than the cost land and rent. 82. The said arrest is unsuccessfully contested by the representatives of the customer. As of May 31, 2021, the State Register of Real Rights does not contain information on the seizure of land plots. Permission was granted for the reconstruction of the hotel for an apartment building without a land plot, since the work is carried out without changing the external geometric dimensions of their foundations in the plan. Residential complex Bartolomeo Resort Town is a sports complex, which should consist of five 25-storey and two 4-storey hotels, as well as a 7-storey sports and recreation complex. In March 2019, the building of a 25-storey hotel was commissioned, which is now being reconstructed into a residential building. 1. LCD Seven from Stolitsa Group on the street. Dnieper embankment, 18 in the Darnytskyi district of Kiev. https://jiji.com.et/kolfe-keranio/baby-care/thutho-enaa-mamagabiyaa-q3EXP7qAQkTYcafFWlK0VGej.html

Comments

Popular posts from this blog

a Nice House for Sale at Kimironko

Property in Rwanda

Sports Equipment in Rwanda